5660 N IH 35 SVRD SB
Scope of work
Turn water off to the building cut out section of 4 water line in the mech room. Install 4 double check assembly on the building feed and install isolation valve. Install 2 double check assembly on the hot water / water softener line. Install 8 RPs on ice makers. Install 2 RPs on laundry equipment. Install 1 double check on the coffee maker and one on the juice machine. All backflow devices will have new supply lines & all RPs will air gaps with drain lines running to existing floor drains. After install all backflow devices will be tested and all reports will be submitted to the city of Austin cross connection dept. **A separate permit will be required for Koetter fire protection will be installing the 6 double check for the fire line inside mechanical room**