13309 MERIDIAN PARK BLVD
Scope of work
New SFR - 2-story; 6 bed; 4.0 bath; covered porch; covered patio; attached 3-car garage. 3/13/18 DD Site Inspection for compliance with tree Permit issued Failed. No Tree Protection fence or mulch per ECM 3.5.2 specs has been installed. 20 (triple stem) Live Oak in the front yard 26 Live Oak near right front corner of house and property line 20 Live Oak at right rear corner of house and property line. Tree protection and mulch for the full CRZ is required at all times during construction. Construction materials and construction activity is impacting the tree root zone. A one time root remediation is required for the full CRZ of all three trees. Remediation is to include soil decompacttion with an air spade incorporate 1 thick layer of organic compost and mulch the 1/2 CRZ with 2 layer of shreaded wood mulch. A deep root hydraulic fertilizer application is required for the Full CRZ of all three trees. All dead and broken branches on these three trees are to be pruned. All Tree work to be preformed by a I.S.A. Certified Arborist. Receipts are required for all work prior to Final Tree Inspection.
Record
Contractor
Willis, Chappell, and Bujan Custom Builders⚡ Alerts for work like this
Every new Building Permit permit in 78652, in your inbox the morning it’s issued.
Set alert · Pro