PERMIT 2026-034947 EP
1709 THOUSAND OAKS CIR
Final
Electrical PermitRepairResidential
Scope of work
EV charger installation: The EV charging outlet will be installed in the garage using a surface mounted electrical pathway along the wall. we will modify the electrical panel by relocating an existing breaker to create space for the new circuit. a new 240-volt circuit will then be installed to support EV charging. wiring will be neatly routed in surface mounted conduit from the panel along the garage wall to the outlet location. The charger will be installed on a 40-amp circuit and will draw up to 32 amp continuous.
Record
Permit number2026-034947 EP
StatusFinal
Applied03-23-26
Issued03-27-26
Expires05-06-26
Completed05-06-26
Valuation—
Housing units1
Council district8