259 permits on latest day$2.2M valuation that day2,371,355 permits on recordLast sync Aug 19, 11:18 PM CTOfficial permit records · verified daily
Map/Contractors/Envirospark Energy Solutions
First seen 09-11-23

Envirospark Energy Solutions

Electrical ContractorAtlanta, 30318-____2 permits in last 12 months91th percentile by volume
Total permits
30
Active permits
5
Total valuation
$53k
Last permit
03-20-26
Service areas
13 zips

Permit activity · last 24 months

ANDJ'25FAMJDM

Work breakdown

Building
14
Electrical
16
Median project value$•••kPRO
Permits expired without closing••%PRO

Based on 24 closed permits. Excludes permits still active, voided, or withdrawn.

Recent permits

Recent·Highest valueShowing 10 of 30
PermitIssuedAddressZipWorkStatusValuation
2026-033607 BP03-20-26420 W SLAUGHTER LN
Install (4) Tesla Gen 3 Wall Connector 48A EV Charger Pedestal Mounted Install (4) Bollards Install (2) Signs
78748Building Permit · NewActive$30k
2025-157395 EP12-15-258312 FATHOM CIR UNIT 4
The scope of work consists of the replacement of the existing electrical meter and base.
78750Electrical Permit · RepairFinal-
2025-053269 EP06-09-253100 SCOFIELD RIDGE PKWY
Installation of 3 EV Chargers
78727Electrical Permit · RemodelFinal-
2025-063174 EP05-23-252200 S PLEASANT VALLEY RD
(4) Tesla Universal Wall Connector (Pedestal Mounted) EV charging stations. New Service taping existing transformer.
78741Electrical Permit · RemodelActive-
2025-063174 BP05-23-252200 S PLEASANT VALLEY RD
(4) Tesla Universal Wall Connector (Pedestal Mounted) EV charging stations. New Service taping existing transformer.
78741Building Permit · RemodelPending Permit-
2025-053269 BP05-22-253100 SCOFIELD RIDGE PKWY
Installation of 3 EV Chargers
78727Building Permit · RemodelFinal-
2025-049085 EP04-25-255000 S IH 35 SVRD SB
(6) Standard parking stalls are to be converted into (2) standard level-2 electric vehicle (EV) parking stalls and (4) Level-3 EV parking stalls. (4) Level-2 EV charging outlets will be installed in the service garage. (2) Level-2 EVCS will be replaced with new. BLDG EV
78745Electrical Permit · RemodelFinal-
2025-049085 BP04-25-255000 S IH 35 SVRD SB
(6) Standard parking stalls are to be converted into (2) standard level-2 electric vehicle (EV) parking stalls and (4) Level-3 EV parking stalls. (4) Level-2 EV charging outlets will be installed in the service garage. (2) Level-2 EVCS will be replaced with new.
78745Building Permit · RemodelActive-
2024-020954 EP04-17-258100 ANDERSON MILL RD BLDG 12
new service for EV charger ETJ ***4/17/25-Reactivated per AE request. Can final when AE is done-Hyatt***
78729Electrical Permit · UpgradeFinal-
2024-020943 EP04-17-258100 ANDERSON MILL RD BLDG 3
new service for EV charger ETJ ***4/17/25-Reactivated per AE request. Can final when AE is done-Hyatt***
78729Electrical Permit · UpgradeFinal-
🔒 20 more permits in this contractor’s record

Pro unlocks the complete history - every project, valuation and address back to 2023 - plus contact details and CSV export.

Unlock with Pro - $39/mo

Contact - from public permit records

Phone•••••••••••PRO
CityAtlanta
Zip30318-____
Unlock contacts · Pro

Similar contractors · Electrical Contractor

⚡ Track this contractor

Get an email whenever Envirospark Energy Solutions pulls a new permit anywhere in Austin.

Track · Pro

Before you hire

Does Texas require a general contractor's license?

No - Texas does not license general contractors statewide. Electricians and HVAC/mechanical contractors need a license from the Texas Department of Licensing and Regulation (TDLR), and plumbers need one from the Texas State Board of Plumbing Examiners (TSBPE). General remodeling and construction work has no state licensing requirement, though some cities and counties have their own registration rules.

How can I verify a contractor's license?

For electrical or HVAC work, search the contractor's name at tdlr.texas.gov. For plumbing, search tsbpe.texas.gov. This site doesn't show license status directly - this permit history is a separate, complementary check, not a substitute for verifying licensing directly with the state.

What does an open or expired permit mean?

An "Active" permit means work is in progress and hasn't been finaled by the city yet. An "Expired" permit means it lapsed before the work was ever closed out - that can mean the project stalled, or that the work was never properly inspected and signed off. Neither is automatically a red flag, but it's worth asking about directly.

What if there's clearly work done but no permit on file?

Certain renovations, additions, and system replacements legally require a permit in Austin. If you can see evidence of work - a new addition, an updated electrical panel, a converted garage - with nothing matching in the permit history, that's worth raising with the seller, contractor, or a licensed inspector before moving forward.

Should I get more than one bid?

Generally yes, especially for larger projects. Comparing a contractor's typical project size and pricing here alongside a couple of competing bids can help you judge whether a quote is reasonable for the scope of work.