259 permits on latest day$2.2M valuation that day2,371,355 permits on recordLast sync Aug 20, 01:44 AM CTOfficial permit records · verified daily
Map/Contractors/GCDD CONSTRUCTION [Main]
First seen 03-31-14

GCDD CONSTRUCTION [Main]

General ContractorAUSTIN, 787011 permits in last 12 months93th percentile by volume
Total permits
40
Active permits
0
Total valuation
$1.9M
Last permit
05-06-26
Service areas
6 zips

Permit activity · last 24 months

SM

Work breakdown

Building
30
Other
10
Median project value$•••kPRO
Permits expired without closing••%PRO

Based on 36 closed permits. Excludes permits still active, voided, or withdrawn.

Pricing

Under $5k
7
$5k-$20k
2
$50k-$100k
2
$100k-$250k
10
$250k-$500k
1

Value not on file: 18 permits.

Recent permits

Recent·Highest valueShowing 10 of 40
PermitIssuedAddressZipWorkStatusValuation
2026-055880 BP05-06-268010 MULEY DR
Express: window replacement (like for like) door replacement (like for like exempt)
78759Building Permit · RepairFinal-
2024-112823 DS09-04-24613 CLIFFORD DR
Construct new 2nd driveway approach of 12 FT. No sidewalk inspection per plan review.
78745Driveway / Sidewalks · NewFinal-
2024-008495 DS09-04-24613 CLIFFORD DR
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
78745Driveway / Sidewalks · NewFinal-
2024-011369 BP02-08-241402 CANOE BROOK DR
Expedited Review - New Autofill Pool w/SPA -Permit voided as a result of disannexation effective September 9 2024. See Ordinance No. 20240829-163.
78746Building Permit · NewVOID$1
2024-011368 BP02-07-241402 CANOE BROOK DR
Expedited Review - New Construction of a 2-Story Single Family Res. [5bed 5.5bath] with attached Garage and detached Pool bathroom [1bath].-Permit voided as a result of disannexation effective September 9 2024. See Ordinance No. 20240829-163.
78746Building Permit · NewVOID$1
2024-008495 BP02-07-24613 CLIFFORD DR
Expedited Review - New construction of 2-story duplex with Covered Porches [6bed 3bath].
78745Building Permit · NewFinal$1
2022-038774 DS09-18-233004 PIN OAK CT
Demo old driveway.Construct new driveway approach of 18 FT and curb & gutter of 11 FT.
78704Driveway / Sidewalks · ModificationFinal-
2023-006042 BP01-26-232801 E 22ND ST
Converting existing single-family dwelling into an accessory structure. Complete removal of the kitchen and plumbing connections. See related permit 2021-013163 PR
78722Building Permit · Addition and RemodelFinal$1
2021-052935 BP01-18-232801 E 22ND ST
Expedited Review - Addition/Remodel to an existing 1-Story Accessory Structure (converting SF Res to Accessory Structure [2bed 2bath])
78722Building Permit · Addition and RemodelWithdrawn-
2021-052934 DS11-02-222801 E 22ND ST BLDG 3
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
78722Driveway / Sidewalks · NewFinal-
🔒 30 more permits in this contractor’s record

Pro unlocks the complete history - every project, valuation and address back to 2014 - plus contact details and CSV export.

Unlock with Pro - $39/mo

Contact - from public permit records

Phone•••••••••••PRO
CityAUSTIN
Zip78701
Unlock contacts · Pro

Similar contractors · General Contractor

KB Home17,495
⚡ Track this contractor

Get an email whenever GCDD CONSTRUCTION [Main] pulls a new permit anywhere in Austin.

Track · Pro

Before you hire

Does Texas require a general contractor's license?

No - Texas does not license general contractors statewide. Electricians and HVAC/mechanical contractors need a license from the Texas Department of Licensing and Regulation (TDLR), and plumbers need one from the Texas State Board of Plumbing Examiners (TSBPE). General remodeling and construction work has no state licensing requirement, though some cities and counties have their own registration rules.

How can I verify a contractor's license?

For electrical or HVAC work, search the contractor's name at tdlr.texas.gov. For plumbing, search tsbpe.texas.gov. This site doesn't show license status directly - this permit history is a separate, complementary check, not a substitute for verifying licensing directly with the state.

What does an open or expired permit mean?

An "Active" permit means work is in progress and hasn't been finaled by the city yet. An "Expired" permit means it lapsed before the work was ever closed out - that can mean the project stalled, or that the work was never properly inspected and signed off. Neither is automatically a red flag, but it's worth asking about directly.

What if there's clearly work done but no permit on file?

Certain renovations, additions, and system replacements legally require a permit in Austin. If you can see evidence of work - a new addition, an updated electrical panel, a converted garage - with nothing matching in the permit history, that's worth raising with the seller, contractor, or a licensed inspector before moving forward.

Should I get more than one bid?

Generally yes, especially for larger projects. Comparing a contractor's typical project size and pricing here alongside a couple of competing bids can help you judge whether a quote is reasonable for the scope of work.

GCDD CONSTRUCTION [Main] - Austin Permit History & Contact | Austin Permit Search