3302 WERNER AVE
FinalScope of work
1) Replace Cedar Post foundation with concrete piers. 2) Replace electrical feed from street to house (meter & breaker box). 3) Install new central air-conditioning system (longer-term portion of the project). 4) Replace Plumbing as needed. 5) Repair/remodel existing garage (no increases in footprint). All changes/improvements are within the existing wall or are replacements of existing fixtures (with the exception of window AC units being supplanted by central eventually). 1ST INSPECTION MUST BE A PRE-CONSTRUCTION INSPECTION. EROSION/SEDIMENTATION CONTROLS REQUIRED FOR ALL CONSTRUCTION. NOTHING MAY BE BUILT WITHIN OR EXTEND OVER ANY DRAINAGE EASEMENT. Residential review by W. Gilbreath
Record
Every new Plumbing Permit permit in 78722, in your inbox the morning it’s issued.
Set alert · Pro