1615 S 2ND ST BLDG 8
Scope of work
New 2-story Condominium Residence with attached garage covered porches balcony and patio. *CONDOMINIUM RESIDENCE* 2/23/18 DD Tree protection in place. Five Year Tree Care Plan for the 5 Pecans has been executed. 2/15/18 DD A site inspection was completed on 1/31/18. Development / Utility Construction work is ongoing without proper Tree Protection for the Heritage Pecan trees (2 in the front 3 along the North property line. Tree Protection and mulch per ECM 3.5.2 specs and the Tree Permit issued are required to be in place at all times during construction activities. A on site meeting is required with the property owner contractor their Independent Certified Arborist the Citys Inspecting Arborist and Compliance Supervisor ([email protected]) to review current development impacts. A Five Year Tree Care Plan is required mitigate for impacts. The Tree Care Plan is to be provided and implemented by a independent Certified Arborist. Tree Care Plan shall follow ECM 3.5.4 P-6 specs and be reviewed for completeness by the City Arborist Environmental Compliance Supervisor. Please provide all information to [email protected] . Tree care to include post construction Air tilling of soil within the Full CRZ and incorporation of 1 of compost prior to applying landscape mulch. Re inspection fee for the Notice of Violation is owed ($300.56) Tree protection measures (per ECM 3.5.2 specs must be in place) and fees paid prior to resuming work on site. Prior to Final Tree Inspection Executed copies of Tree Care Plan shall be provided. Entire Scope of Tree Care Plan shall be paid and receipts provided prior to final Tree Inspection
Record
⚡ Alerts for work like this
Every new Building Permit permit in 78704, in your inbox the morning it’s issued.
Set alert · Pro