13016 MERIDIAN PARK BLVD
Scope of work
New construction single family residential 2-story 5 bedroom 5 bath with attached 3-car garage covered front porch and covered rear patio. 11/01/18 DD Tree Pre Con Inspection failed. Site is not compliant with the Tree Permit issued. Tree (29 Live Oak is required to be saved) is being impacted by construction activities. Tree Protection and mulch are not in place per ECM 3.5.2 specs. Re inspection is required. Re inspection fee is owed. Contact [email protected] for additional information. 2.27.19 SC Mulch and fencing has been corrected. 2 8 Live Oaks in center back yard have been identified fenced and mulched as 16 of the 24 total mitigation needed as specified by ECM 3.5.2. 4/4/19 MW Mitigation trees need more mulch especially outside tree protection fencing but otherwise compliant.
Record
⚡ Alerts for work like this
Every new Building Permit permit in 78652, in your inbox the morning it’s issued.
Set alert · Pro