811 W JAMES ST
Scope of work
Construct 12 ft driveway approach. Shall meet all city standards. Applicant paid fee in lieu of sidewalk installation The alley behind 811 West James is maintained by the City of Austin Street & Bridge Operations. We currently maintain the alley with milling material and we will continue to maintain. We have no plans at this point pave with asphalt. The developer will need to use the top of the existing surface as their starting grade for the driveway. They will also need to do around a 4-5 (estimate) wide by the length of the driveway concrete approach in the right of way to tie into the travel path on the alley. They will also need to place an expansion joint at the right of way line.- Sam WestFence 4 in height max 4 opening gates must be equipped with self-closing and self-latching device required.