9700 DECKER LN
Scope of work
Condensate: Provide and install the following: CPVC piping hung from joist ran up to RTUs insulated interior piping to discharge @ existing floor sink located in pump room (160) lf. 1 piping above grade (60) lf. 1 piping above grade (220) lf. piping above grade (3) qty. RTU unit connections Natural Gas 5: Provide and install the following: 220 MBH w/ 600 lf. of piping @ 2PSI Sch. 40 Black steel pipe 5 out from meter hung from joist ran up to RTU units 2 and larger-welded pipe and fittings 2 and smaller-threaded pipe and fittings (320) lf. 2 natural gas piping (60) lf. 2 natural gas piping (220) lf. 1 natural gas piping (3) qty. RTU unit connections (1) qty. Meter connection